Title: Award a Construction Contract: Central and Edison Avenues Sewer Main Line Repairs.
Attachments: 1. Agreement - Pipe Tec, Inc.

TO:                      LINDA REICH, CITY MANAGER

FROM:                      HYE JIN LEE, DIRECTOR OF PUBLIC WORKS

 

 

SUBJECT

title

Award a Construction Contract: Central and Edison Avenues Sewer Main Line Repairs.

end

RECOMMENDATION

1) Award a construction contract for $92,900 to Pipe Tec, Inc., Baldwin Park, CA, for the repair of a sewer main line at the intersection of Central and Edison Avenues; 2) authorize expenditures for a not-to-exceed contract amount of $92,900; and 3) authorize the City Manager to execute all necessary documents on behalf of the City.

body

FISCAL IMPACT

Sufficient funds are included in the 2023-2024 operating budget.

CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES

The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:

•                     Responsible Long-Range Planning

•                     Public Service Excellence through Internal and External Partnerships

 

 

 

 

 

Revenue: Click or tap here to enter text. 

Expenditure: 5307320-43580

Transfer In: Click or tap here to enter text.

Transfer Out: Click or tap here to enter text.

BACKGROUND

The Public Works Department - Streets Division is responsible for maintaining sewer infrastructure consisting of approximately 226 miles of sewer mainlines. In November of 2023, Public Works Services received a call for a sewer backup at the intersection of Central and Edison Avenues. Public Works wastewater staff responded and cleared the blockage. Subsequently, wastewater staff conducted a televised inspection of the sewer main line, identifying a failure in a section of the main line pipe. This failure caused a backup, necessitating immediate repairs in the identified section as well as other sections of the sewer main line.

ISSUES/ANALYSIS

The intersection at Central and Edison Avenues is a major intersection that requires extensive traffic control for the repair work. While the City’s Public Works crew is capable of performing this types of work, due to extensive traffic control that would exhaust the City’s resources, staff recommends contracting this work to a qualified contractor. A concrete sewer pipe is not an industry norm-recommended sewer pipe material. Concrete sewer pipes are prone to corrosion due to off-gas from the sanitary sewer water. The contractor will replace the section with a vitrified clay pipe material. Public Works field staff and Engineering initiated a sewer inventory of all concrete sewer pipes to schedule them for sewer lining to prevent another concrete pipe cave-in due to corrosion.

In November 2023, staff solicitated three qualified contractors specializing in excavation and sewer pipe replacement to submit bids for the repair. Based on the distance from the manhole to the break in pipe, the contractors submitted bids to repair up to 25 feet of 8-inch concrete sewer pipe. In early December of 2023, three (3) bids were received with the following results:

 

Company

Location

Bid Amount

Pipe Tec, Inc.

Baldwin Park

$92,900

W.A. Rasic Construction

Long Beach

$93,666

TK Construction

San Bernardino

$126,000

 

Pipe Tec, Inc., Baldwin Park, CA, was determined to be the lowest, most responsive, and responsible bidder. References regarding Pipe Tec, Inc. indicate that the firm has the knowledge and experience required to perform the sewer main line repair. All support documents are on file with the City’s Finance Department/Purchasing Division. Therefore, staff recommends that the City Council award a construction contract to Pipe Tec, Inc., Baldwin Park, CA, for a not-to-exceed amount of $92,900.

 

Attachment - Pipe Tec, Inc. Agreement