Legislation Details

File #: 26-610   
Type: New Business Status: Agenda Ready
File created: 10/22/2026 In control: City Council
On agenda: 12/1/2026 Final action:
Title: Award Construction Contract to Van Engineering, Inc. for TR271 - Intersection Improvements (Moonspinner Street at West Preserve Loop).? 
Attachments: 1. Exhibit A - TR271 Vicinity Map, 2. Exhibit B - Construction Contract (Van Enginnering Inc.)
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                           LINDA REICH, CITY MANAGER

FROM:                      HYE JIN LEE, DIRECTOR OF PUBLIC WORKS

 

 

SUBJECT

title

Award Construction Contract to Van Engineering, Inc. for TR271 - Intersection Improvements (Moonspinner Street at West Preserve Loop).​

end

RECOMMENDATION

recommendation

1) Award a construction contract to Van Engineering, Inc. for $227,700 for Project TR271; 2) appropriate $112,644 from the Measure I Fund (322) and increase the project budget for TR271 by the same amount for a revised total project budget of $262,644; 3) authorize approved contract change orders up to $22,770 (10% of contract amount) for construction contingencies; and 4) authorize the City Manager to execute the necessary documents on behalf of the City. 

body

FISCAL IMPACT

Requires an appropriation in the amount of $112,644 from the available FY 2026-27 Measure I Fund Balance (Fund 322). Fiscal Year 2026-27 project budget is summarized below:  

​Project TR271 - Intersection Improvements (Moonspinner St at West Preserve Loop)

​Fund

​Adopted Budget

​Expenditures

Appropriation

​Available Budget

​322 - Measure I

​$100,000

​($174)

$112,644

​$212,470

​100 - General

​$50,000

-

-

​$50,000

Total Project Budget:

$150,000

​($174)

$112,644

​$262,470

​ ​

CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES

The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:

•                     Positive City Image

•                     Superior Customer Service

 

 

 

 

Revenue: 

Expenditure:

Transfer In:

Transfer Out:

BACKGROUND

The TriPointe Homes residential development located at the northeast corner of Pine Avenue and West Preserve Loop began construction of public improvements in mid-2025. One of the developer's conditions of approval was to construct the ultimate street improvements along their frontage on West Preserve Loop. That work included widening the roadway on the east side and establishing a raised median identified per the Preserve Specific Plan. 

​Immediately following the Developer’s installation of the raised median, residents of the existing neighborhood bounded by Mill Creek Avenue, Bickmore Avenue, West Preserve Loop, and Pine Avenue contacted the City with concerns regarding changes to their existing access. Prior to the median installation, the neighborhood had three locations where left-turn access movements were permitted. Although the Preserve Specific Plan identified a median along this roadway segment, the newly installed median differed from the long-standing access conditions that had been in place since the neighborhood’s construction in 2008 without the raised median on West Preserve Loop. Residents had become accustomed to this left-turn access point, and the conversion to right-in/right-out at Moonspinner Street and West Preserve Loop impacted local circulation patterns.

​At the October 28, 2025, Infrastructure/Streets Committee meeting, Public Works staff provided this background and update regarding construction of public improvements on West Preserve Loop and a recommendation to request that the Developer assist the City in constructing an adjustment of the median to accommodate a left turn pocket and upgrading curb ramp facilities to meet ADA standards prior to completing their final pavement resurfacing. The Committee was amicable to this approach and staff shared that the Developer was interested in incorporating this work into their schedule.  The Developer initially considered the option feasible but ultimately chose not to proceed with the modifications prior to the project’s final pavement resurfacing due to the effort being cost prohibitive for them. Because these items were not included in the project’s conditions of approval, the City could not require the developer to complete this additional work.

​City staff recognized the need to program these improvements into the City’s CIP and programmed project TR271 - Intersection Improvements (Moonspinner Street at West Preserve Loop), which was approved by City Council as part of the Fiscal Year 2026-27 Budget adoption.​

​On July 28, 2026, staff provided the Infrastructure/Streets Committee a formal update of TR271 scope summarizing the design elements evaluated and incorporated into the current plans. The project addresses the need to reestablish left-turn vehicle access to South Meridian Park and its adjacent neighborhood, which is currently limited by the raised median configuration. The design also responds to identified pedestrian accessibility gaps by introducing a new ADA-compliant crossing facility to connect the developer constructed east side sidewalk to the existing west side sidewalk.

​As part of the project scoping, staff evaluated options to enhance pedestrian safety at the uncontrolled intersection of West Preserve Loop and Moonspinner Street. The recommended improvements included adding an Rectangular Rapid Flashing Beacon (RRFB) to increase driver awareness and providing a more visible crossing connection to access South Meridian Park from the east side of West Preserve Loop. In addition, the design incorporates a break in the raised median to restore left-turn access for vehicles and bicycles traveling toward the park and the neighborhood to the west.

​At the September 15, 2026, City Council Meeting, project plans and specifications as approved by the Director of Public Works were approved and staff were given authorization to solicit construction bids for project TR271.

ISSUES/ANALYSIS

On September 25, 2026, the City issued an Invitation for Bids (IFB#2026-0024) “TR271 Intersection Improvements Moonspinner St at West Preserve Loop” on PlanetBids, in accordance with the City’s procurement policies and the Public Contract Code. By the stated deadline of October 22, 2026, the City received ten (10) construction bids. The results were as follows:

Rank

Contractor

​Location

​Bid Amount

​1

Van Engineering, Inc.

​Wildomar, CA

​$227,700

2

Gentry Brothers, Inc.

Irwindale, CA

​$255,156

3

Roadway Engineering & Construction Corp.

​Perris, CA

​$257,154

4

Copp Contracting, Inc.

Buena Park, CA

$259,690

5

ONYX Paving Company Inc.

Yorba Linda, CA

$336,000

6

Terra Pave, Inc.

Whittier, CA

$357,500

7

Cheloletty Engineering

Villa Park, CA

$408,170

8

Addison-Miller Inc.

Orange, CA

$477,287

N/A

Estate Design & Construction*

Culver City

​$204,500*

N/A

Mendoza Engineering Company, Inc*

Fontana, CA

$333,060*

*Note: During bid evaluation, a discrepancy was identified with Estate Design & Construction and Mendoza Engineering Company, Inc. The bids submitted by Estate Design & Construction and Mendoza Engineering Company, Inc. are considered non-responsive bids.

After evaluation of the bids, City staff identified Van Engineering, Inc. as the lowest responsive and responsible bidder. Staff recommend the City Council award a construction contract for $227,700 to Van Engineering, Inc. for TR271. Staff also recommend that the City Council authorize up to $22,770 (10% of the contract amount) for construction contingencies as allowable per Public Contract Code. Staff reviewed the Contractor’s licensing, bonding, references, and list of subcontractors submitted for the project and found all bid submittal documentation to be in order. The estimated project construction costs are itemized below: 

​Project Task

​Vendor

​Total

​Construction

Van Engineering, Inc.

​$227,700

​10% Construction Contingency 

​As allowable per Public Contract Code 

​$22,770

​Inspection / Geotechnical Engineering Services

AESCO, Inc.

​$12,000

​Total Estimated Construction Costs:

​$262,470

 

 

 

​​​Accessibility

​The project scope improves safety of the public’s access by providing safety features.  Prior to the ultimate improvements built along West Preserve Loop, pedestrian access was limited to the west side of the street strictly for north-south directional travel. Improvements include upgrading existing north-south pedestrian facilities to meet ADA standards and adding a Rectangular Rapid Flashing Beacon (RRFB) crossing to facilitate and enhance east-west pedestrian access across West Preserve Loop.

Environmental

​This project is exempt from the California Environmental Quality Act (CEQA) according to Section 15302 of the CEQA Guidelines - Replacement or Reconstruction, which includes the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. This project consists of the removal of a landscaped median to restore left-turn access into the residential community via Moonspinner Street and add pedestrian connectivity with no increase in capacity. A Notice of Exemption was filed with the CEQA clearinghouse and San Bernardino County Clerk Recorder’s Office prior to advertisement for bids.

​

​Attachments:                     Exhibit A - TR271 Project Vicinity Map

​                                          Exhibit B - Construction Contract - Van Engineering, Inc.