Legislation Details

File #: 24-337   
Type: Consent Calendar Status: Passed
File created: 6/12/2024 In control: City Council
On agenda: 7/2/2024 Final action: 7/2/2024
Title: Award of Contract - General Pump Company, Inc. for On-Call Well or Pump Repair Services.
Attachments: 1. General Pump Company, Inc. - Agreement

TO:                      LINDA REICH, CITY MANAGER

FROM:                      HYE JIN LEE, PE, DIRECTOR OF PUBLIC WORKS

 

 

SUBJECT

title

Award of Contract - General Pump Company, Inc. for On-Call Well or Pump Repair Services.

end

RECOMMENDATION

Award a contract to General Pump Company, Inc., San Dimas, CA, for $138,400 for annual on-call well or pump repair services; and authorize the City Manager to execute the necessary documents on behalf of the City.

body

FISCAL IMPACT

There are sufficient funds in the FY 2024-25 Water Services Program to award this contract.

CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES

The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:

•                     Superior Customer Service

•                     Financial Stability

•                     Responsible Long-Range Planning

 

 

 

 

 

 

 

Revenue: Click or tap here to enter text. 

Expenditure: 5207300-43585

Transfer In: Click or tap here to enter text.

Transfer Out: Click or tap here to enter text.

BACKGROUND

The City of Chino’s Public Works Department Water Division oversees the maintenance and operation of the City’s various water assets and distribution systems. Provision of these maintenance and operation services is critical, ensuring reliable potable water distribution to approximately 80,000 residents. The City produces approximately half of its total potable water supply by operating City-owned groundwater wells. Currently, the City owns and maintains twelve (12) groundwater wells and fourteen (14) booster pumps, which require routine maintenance and, occasional emergency repairs. Groundwater production is supplemented with purchased imported water to supply both potable and recycled water services for residential, agricultural, retail, and industrial customers.

City staff, with the assistance of qualified contractors and consultants, accomplish the necessary maintenance and operations annually. One of the essential services provided with assistance includes on-call well and pump repair services, which is utilized for as-needed services for City-owned groundwater wells and booster pumps. Minor repairs that do not require specialized equipment are performed by city staff; however, more extensive repairs that require specialized equipment and expertise often necessitate contracted services. These specialized services may include the removal and re-installation of a well pump, booster pump removal and re-installation, well casing cleaning and rehabilitation, and well video survey.

 

ISSUES/ANALYSIS

On May 9, 2024, the City solicited an Invitation for Bids (IFB) on Planet Bids for On-Call Well or Pump Repair Services. On May 30, 2024, the City received (1) one proposal:

 

 

Contractor

Location

Annual Cost

1.

General Pump Company, Inc.

San Dimas, CA

$138,400

 

Therefore, City staff recommends that the City Council approve a contract to General Pump Company, Inc., San Dimas, CA for $138,400 for on-call well or pump repair services.

 

Attachment - General Pump Company, Inc. Agreement